Ships and marine technology. Major components of emergency towing arrangements Ingestion-build-68772 stop valve
$116.00
Description
stop valve
NOTE: BS EN 1706:2020 is intended to be used in conjunction with BS EN 576
construction methods and design details covering: the junction of walls and ceilings
Builders / real estate developers / architects
Ships and marine technology. Major components of emergency towing arrangements Ingestion-build-68772 stop valveWhat is this standard about? This document specifies the technical requirements, test methods, inspection rules and markings for major components of emergency towing arrangements (ETA) provided for tankers, gas carriers (LPG, LNG, etc.) and chemical vessels no less than 20 000 deadweight tonnes (DWT). It is only applicable to emergency towing arrangements as defined in this document.
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.