US$ 24.95
Information technology. Open Connectivity Foundation (OCF) Specification - Bridging specification Ingestion-build-46800 New clause "safety of barefoot"
$161.00
Description
New clause "safety of barefoot" area has been added by adding requirements for the finish of the wet area and the slip resistance
logging and
checks are made to ensure the serviceability criteria (i
Testers of concrete
Information technology. Open Connectivity Foundation (OCF) Specification - Bridging specification Ingestion-build-46800 New clause "safety of barefoot"What is this standard about? This document specifies a framework for translation between OCF devices and other ecosystems, and specifies the behaviour of a translator that exposes AllJoyn producer applications to OCF clients, and exposes OCF servers to AllJoyn consumer applications. Translation of specific AllJoyn interfaces to or from specific OCF resource types is left to other specifications. Translation of protocols other than AllJoyn is left to a
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.